Hamilton carried out EWI to the PAS 2035 standard on 26 homes in Hounslow. It is one of many projects we have worked on with other fantastic teams and is part of an overall strategy to future-proof social housing properties.

Trusted supplier, Soltherm, delivered its impact resistant Endurance W+ Silicone and Ultimate HD Dash systems along with its Deco X Mosaic for below DPC/plinth level.

Due to the funding and PAS requirements there were several design elements that needed careful consideration, with significant input from retrofit designers and specialist coordinator teams from all partners. Challenges included identifying properties with differing substrates, which meant it was back to the drawing board in terms of specifications.

In addition, properties needed to be borescoped to ensure the cavity is empty to avoid any thermal bridging or condensation risk issues Other problems included curved walls, ornamental brick bay windows and giant gallows brackets supporting the roof of some of the properties. Everyone worked together to overcome obstacles and the end result was not only stunning, but it will also mean that residents will cut energy usage and contribute to reducing the carbon footprint of the area.

Kirsty Haley, Operations Director at Hamilton, said:

Successful partnerships between main and sub contractors are like the cornerstone of a strong building. When challenges arise it’s about rolling up our sleeves together and finding solutions – and that is exactly what happened on this project. We have a commitment to our common goal and together we found solutions to every issue that came up.

Pete McNulty, Contracts Manager at Hamilton, added:

The true measure of our success is not the absence of challenges, but our dedication to overcoming them as a wider team. Together, we quickly identified issues and went back to the drawing board to come up with workable solutions that would enable us to meet all required standards in time for the deadline. The results are outstanding and the residents are delighted with their new look, energy efficient homes.